1.
Parallel Machine Scheduling with Shortest Processing Time (SPT) and Longest Processing Time (LPT) TO Minimize MAKESPAN at PT.ABC. RIGEO [Internet]. 2021 May 11 [cited 2026 Nov. 6];11(6):404-7. Available from: https://rigeo.org/index.php/rigeo/article/view/548