1.
Parallel Machine Scheduling with Shortest Processing Time (SPT) and Longest Processing Time (LPT) TO Minimize MAKESPAN at PT.ABC. RIGEO. 2021;11(6):404-407. Accessed November 6, 2026. https://rigeo.org/index.php/rigeo/article/view/548